Silt fence and erosion control on a steep mountain lot

Do I need a permit to rebuild a driveway washed out by Helene in Asheville?

Last verified Nov 15, 2026 · Reviewed by Sarah Johnson

Sample photo

Answer
It depends
Steps
5
Related guides
1

Short answer

Usually yes for the part in the right-of-way. Rebuilding the apron or culvert at the street needs a right-of-way permit; on a state road, NCDOT handles it. Ask about any storm-recovery process before you file.

Which permit comes first

Is the street maintained by NCDOT?

YesNCDOT permit first, then the city permit

NoCity right-of-way permit only

Steps

  1. Photograph the damage before any work.
  2. Find out who maintains the road: City, County or NCDOT.
  3. Ask whether a storm-recovery process applies [check current status].
  4. Apply for the right-of-way or NCDOT driveway permit with the culvert size.
  5. Rebuild to the approved detail and request the inspection.

Example content, not verified. Every page is checked and approved by Sarah Johnson before it goes live.