Permit glossary
The words reviewers use, in plain English.
Sample definitions, written generally. Check the agency's current rules.
#
- 811 locate
- The free call-before-you-dig request so utility owners mark their lines before excavation. See a guide →
A
B
- Backflow preventer
- A device that stops water from a building flowing back into the public system. See a guide →
- Build-out
- Finishing the inside of a commercial space for a tenant. See a guide →
C
- Closeout
- Final inspections, punch list and paperwork that close every permit on the job. See a guide →
- CO
- Certificate of occupancy: the final sign-off that the building can be used. See a guide →
- Comment letter
- The reviewer's list of what must change before the permit can be issued.
- Curb cut
- A lowered section of curb for a driveway or an accessible ramp. See a guide →
D
- Design professional of record
- The licensed professional who signs and seals the drawings and answers design comments.
- Driveway apron
- The part of a driveway between the street and the property line, built to the city's standard detail. See a guide →
- Driveway permit
- Approval to build or change a driveway connection to a street. On a state road, NCDOT issues it before the city permit. See a guide →
E
- Encroachment agreement
- NCDOT's permission to place or work on something inside a state road's right-of-way, such as a utility line or a driveway. See a guide →
- Erosion and sediment control
- Measures that keep soil on site and out of streets and streams: silt fence, inlet protection, construction entrance. See a guide →
F
- Fire line
- The water service that feeds a building's sprinklers, separate from the domestic line. See a guide →
- Flow test
- Opening a hydrant to measure the water pressure and flow available for a fire line. See a guide →
H
- Hydrostatic test
- Holding a new pipe at pressure for a set time to prove it does not leak. See a guide →
I
- Inspection
- The agency's site visit to check the work against the approved plans.
L
- Land disturbance permit
- Approval to grade or clear land above the local size limit, with an erosion control plan. See a guide →
- Lane closure
- Permission to close a travel lane or sidewalk for a set time window. See a guide →
M
- Maintenance of traffic (MOT)
- How cars, bikes and people get safely past the work zone while the crew works. See a guide →
- Master permit
- The main building permit for a commercial project that the trade permits hang from. See a guide →
N
- NPDES
- The federal stormwater program behind construction stormwater permits, run in each state by its environmental agency. See a guide →
P
- Permit holder
- The licensed contractor or owner responsible for the permitted work.
- Plat
- The recorded map that creates or changes lots, easements and rights-of-way.
- Post-construction stormwater
- The permanent ponds, basins or devices that treat runoff once the project is built. See a guide →
- Pre-submittal meeting
- A meeting with agency staff before filing, to confirm what the package needs.
- Punch list
- The short list of items left to fix before final sign-off.
R
- Restoration
- Putting pavement, curb, sidewalk or grass back to the agency's standard after the work. See a guide →
- Resubmittal
- The corrected package sent back with a response to each comment.
- Review round
- One cycle of submittal and agency review. Each extra round adds weeks.
- Right-of-way (ROW)
- The public land along a street: the road, curb, sidewalk and utility strip. Work there needs a permit from whoever maintains the street. See a guide →
- Right-of-way bond
- A surety some agencies require to cover restoration if the work is left unfinished. See a guide →
S
- Sealed drawings
- Drawings stamped by a licensed design professional. Our licensed partners provide them.
- Silt fence
- A low fabric fence that traps sediment at the downhill edge of a site. See a guide →
- Site plan
- The drawing of the property showing buildings, driveways, utilities and the work in the right-of-way. See a guide →
- State-maintained road
- A street NCDOT maintains. Work there starts with an NCDOT permit, then the city. See a guide →
T
- TCO
- Temporary certificate of occupancy: lets people use the building while minor items are finished. See a guide →
- Traffic control plan (TCP)
- The drawing that shows signs, cones, arrow boards and detours for the work zone. Reviewers check it closely. See a guide →
- Tree protection zone
- The fenced area around a tree's roots where digging and storage are not allowed. See a guide →
U
- Utility cut
- Cutting the pavement to reach or install a utility, then restoring it. See a guide →
W
- Water or sewer tap
- The connection of a new service to the public main, usually with a fee and an inspection. See a guide →