How a permit moves
Pick a sample job and press play. Then compare a package prepared first with one filed as-is.
Run a sample job
You
PreparedForYes
Licensed partner
NCDOT
City
Day 0IntakeYouSite plan
Day 2Site and drawing auditPreparedForYes
Day 6PackageLicensed partner
Day 9NCDOT permitNCDOT
Day 30NCDOT reviewNCDOT
Day 31City ROW permitCity
Day 45Comments answeredPreparedForYes
Day 52IssuedCity
Day 70InspectionsCity
Day 82CloseoutPreparedForYes
9 more steps
What reviewers look for
1
Right-of-way line and edge of pavement
The R/W line, the property line and the edge of pavement are labelled and dimensioned from the road centerline.
Example drawing, not for construction. Not to scale. Tap a number to see what reviewers check.
Who does what
You send
- Site address and scope
- Drawings you already have
- Owner authorization
- Licence and insurance
We prepare
- Agency list, in filing order
- Complete package and forms
- Comment responses
- Inspections and closeout
Licensed partner
- Drawings that need a seal
- Traffic control plans
- Sealed answers to comments
- Or your own design professional
The agency decides
- Reviews the package
- Issues comments or the permit
- Inspects the work
- Signs off closeout
You send the site information. We assemble, check, file and track the package. Drawings and anything that needs a seal, including traffic control plans, are prepared and sealed by a licensed partner or your own design professional of record.