Yes. A new tap needs approval from the public utility for the connection and a right-of-way permit for the street or sidewalk cut. Expect connection fees and a backfill inspection before the patch.

Steps

  1. Confirm meter and service size with the utility.
  2. Show the tap location and trench on the utility plan.
  3. Apply for the utility connection and the right-of-way cut permit.
  4. Pay connection fees [$___] before the tap is scheduled.
  5. Pass the trench backfill inspection, then patch.