Final certificate of occupancy (CO) inspection, City of Asheville
Last verified Nov 1, 2026 · Reviewed by Sarah Johnson
Sample photo
- Items checked
- 5
- Common fails
- 4
The CO closes the project. Every permit on the job must be finaled, every open item from the TCO closed, and the right-of-way restored.
What the inspector checks
- All trade and right-of-way permits finaled
- TCO open items closed
- As-builts and test reports submitted
- Site and stormwater measures accepted
- Fees and bonds settled
Common reasons it fails
- One permit still open
- As-builts missing
- Stormwater device not accepted
- Unpaid fees
How to schedule
Request it after the last final inspection passes; keep the punch list closed out and documented [check current process].