Final certificate of occupancy (CO) inspection, City of Asheville

Last verified Nov 1, 2026 · Reviewed by Sarah Johnson

Sample photo

Items checked
5
Common fails
4

The CO closes the project. Every permit on the job must be finaled, every open item from the TCO closed, and the right-of-way restored.

What the inspector checks

  • All trade and right-of-way permits finaled
  • TCO open items closed
  • As-builts and test reports submitted
  • Site and stormwater measures accepted
  • Fees and bonds settled

Common reasons it fails

  • One permit still open
  • As-builts missing
  • Stormwater device not accepted
  • Unpaid fees

How to schedule

Request it after the last final inspection passes; keep the punch list closed out and documented [check current process].