Water and sewer connection in Broward County
Last verified November 8, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 1
- Typical weeks (sample)
- 4–10
- Documents
- 4
- Inspections
- 2
- Last checked
- November 8, 2026
Short answer
Yes. Connecting to county water or sewer needs a utility connection approval and the connection fees paid. Health department approval may also apply for new mains.
Agencies, in order
- Broward County: utility connection approval
Documents checklist
PreparedForYes1
- Water and sewer availability letter request (the utility issues it)
You1
- Contractor licence and insurance certificate
Licensed partner2
- Utility plan with service sizes
- Flow calculations for meter sizing
Steps
- Request availability for the property.
- Prepare the utility plan and flow calculations.
- File, answer comments and pay connection fees.
- Install, test and request meter set.
Inspections
- Pressure and bacteriological test
- Meter set
Fees, reviewer comments and sources
Fees
- Connection feesSource: Broward County: water and wastewater services[$___]
Common reviewer comments
- Availability letter has expired.
- Backflow device is missing on the irrigation line.
Sources
- Broward County: water and wastewater services · checked November 8, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.