
Driveway permit in the City of Asheville right-of-way
Last verified November 5, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 2
- Typical weeks (sample)
- 6–12
- Documents
- 4
- Inspections
- 2
- Last checked
- November 5, 2026
Short answer
Yes. A new or relocated driveway onto a city street needs a driveway permit. On a state road, the NCDOT driveway permit comes first and the city permit follows.
Agencies, in order
- NCDOT: driveway permitState road only
- City of Asheville: driveway permit
Documents checklist
PreparedForYes1
- NCDOT driveway permit application and follow-up (state roads only; NCDOT decides)
You2
- Property owner's authorization
- Contractor licence and insurance certificate
Your design professional of record1
- Site plan with driveway grade and width
Steps
- Confirm who maintains the street.
- On a state road, get the NCDOT driveway permit first.
- File the city driveway application with the site plan.
- Build to the city detail and request the final inspection.
Inspections
- Forms before the pour
- Final driveway apron
Fees, reviewer comments and sources
Fees
- Driveway permit feeSource: City of Asheville: right-of-way permits[$___]
Common reviewer comments
- Driveway grade is too steep at the street.
- Show the sight distance in both directions.
Sources
- City of Asheville: right-of-way permits · checked November 5, 2026
- NCDOT: driveway permits and encroachment agreements · checked November 12, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.