
Sidewalk and curb cut permit in the Town of Cary
Last verified November 5, 2026 · Reviewed by Sarah Johnson
Sample photo
- Agencies
- 2
- Typical weeks (sample)
- 6–12
- Documents
- 4
- Inspections
- 2
- Last checked
- November 5, 2026
Short answer
Yes. New or replaced sidewalk and curb cuts in the Town of Cary right-of-way need a town right-of-way permit. On a state road, the NCDOT driveway permit comes first.
Agencies, in order
- NCDOT: driveway permitState road only
- Town of Cary: right-of-way permit
Documents checklist
You1
- Contractor licence and insurance certificate
Your design professional of record1
- Site plan with sidewalk and curb cut dimensions
Licensed partner2
- Accessible ramp detail
- Traffic control plan for work in the street
Steps
- Confirm who maintains the street.
- On a state road, get the NCDOT driveway permit first.
- File the town application with the site plan and ramp detail.
- Receive the permit and schedule inspections.
Inspections
- Forms before the pour
- Final sidewalk and ramp
Fees, reviewer comments and sources
Fees
- Town right-of-way permit feeSource: Town of Cary: right-of-way permits[$___]
Common reviewer comments
- Ramp slope is not shown.
- Detectable warning surface is missing at the ramp.
Sources
- Town of Cary: right-of-way permits · checked November 5, 2026
- NCDOT: driveway permits and encroachment agreements · checked November 12, 2026
Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.