Do I need a permit to replace a driveway apron in Raleigh?
Last verified Nov 12, 2026 · Reviewed by Sarah Johnson
Sample photo
- Answer
- Yes
- Steps
- 5
- Related guides
- 1
Short answer
Yes. A driveway apron sits in the public right-of-way, so replacing it needs a City of Raleigh right-of-way permit. If the street is a state road, an NCDOT driveway permit comes first.
Which permit comes first
Is the street maintained by NCDOT?
YesNCDOT permit first, then the city permit
NoCity right-of-way permit only
Steps
- Check who maintains the street: NCDOT or the City.
- On a state road, apply for the NCDOT driveway permit first.
- Apply for the City right-of-way permit with a site plan and the apron detail.
- Post the permit on site before work starts.
- Schedule the apron inspection before the pour.