Driveway apron inspection, City of Raleigh
Last verified Nov 12, 2026 · Reviewed by Sarah Johnson
Sample photo
- Items checked
- 5
- Common fails
- 4
- Book ahead
- 1 business day
The apron is inspected after forming and before the concrete pour. A failed inspection means re-forming and a new request, so check these items first.
What the inspector checks
- Forms match the approved width and flare
- Base is compacted
- Sidewalk cross slope and ramp where the plan shows one
- Curb transition
- Permit posted on site
Common reasons it fails
- Forms wider than the approved plan
- Base not compacted
- Sidewalk slope too steep
- Work started before the permit was posted
How to schedule
Request it through the City's inspection portal at least one business day ahead [check current lead time].