The apron is inspected after forming and before the concrete pour. A failed inspection means re-forming and a new request, so check these items first.

What the inspector checks

  • Forms match the approved width and flare
  • Base is compacted
  • Sidewalk cross slope and ramp where the plan shows one
  • Curb transition
  • Permit posted on site

Common reasons it fails

  • Forms wider than the approved plan
  • Base not compacted
  • Sidewalk slope too steep
  • Work started before the permit was posted

How to schedule

Request it through the City's inspection portal at least one business day ahead [check current lead time].