Worker finishing a new concrete driveway apron between the street and a shop parking lot

Driveway permit in the City of Charlotte right-of-way

Last verified November 4, 2026 · Reviewed by Sarah Johnson

Sample photo

Agencies
2
Typical weeks (sample)
6–12
Documents
5
Inspections
2
Last checked
November 4, 2026

Short answer

Yes. A new or widened driveway onto a Charlotte street needs a driveway permit from the city. On a state road, the NCDOT driveway permit comes first.

Agencies, in order

  1. NCDOT: driveway permitState road only
  2. City of Charlotte: driveway permit

Documents checklist

PreparedForYes1

  • NCDOT driveway permit application and follow-up (state roads only; NCDOT decides)

You2

  • Property owner's authorization
  • Contractor licence and insurance certificate

Your design professional of record1

  • Site plan with driveway, curb cut and sidewalk

Licensed partner1

  • Traffic control plan for work in the street

Steps

  1. Confirm who maintains the street.
  2. On a state road, get the NCDOT driveway permit first.
  3. File with the city and answer review comments.
  4. Build the apron and sidewalk to the city detail.

Inspections

  • Forms and base
  • Final apron and sidewalk

Fees, reviewer comments and sources

Fees
  • Driveway permit feeSource: City of Charlotte: driveway permits[$___]
Common reviewer comments
  • Driveway is too close to the intersection.
  • Sidewalk must continue across the driveway at full width.
Sources

Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.