Sidewalk replacement on a South Florida street lined with palms

Public works right-of-way permit in the City of Miami (handled with a licensed partner)

Last verified November 6, 2026 · Reviewed by Sarah Johnson

Sample photo

Agencies
1
Typical weeks (sample)
3–6
Documents
5
Inspections
2
Last checked
November 6, 2026

Short answer

Yes. Work in a City of Miami right-of-way needs a public works permit. Handled with a licensed partner: our partner files and talks with the City; we prepare and check the package.

Agencies, in order

  1. City of Miami: public works permit (filed by our partner)

Documents checklist

You2

  • Agent authorization for our partner
  • Contractor licence and insurance certificate

Licensed partner3

  • Paving, grading and drainage plan
  • Survey of the right-of-way
  • Traffic control plan for work in the street

Steps

  1. We prepare and check the package.
  2. Our licensed partner files it and handles all contact with the City.
  3. We draft comment responses; the partner submits them.
  4. The partner schedules inspections and closes the permit.

Inspections

  • Base and forms
  • Final right-of-way inspection

Fees, reviewer comments and sources

Fees
  • Public works permit feeSource: City of Miami: public works[$___]
Common reviewer comments
  • Show the swale and drainage restoration.
  • Maintenance of traffic plan is missing.
Sources

Example content, not verified. Fees stay as [$___] until checked against the agency's current schedule.